Life, , 6 min read
A week built around two deep-work blocks
A template you can copy on Monday: two protected blocks a day, shallow work in batches, and a short review on Friday.
On this page
Most weeks are planned from the outside in. The calendar fills with calls other people booked, the inbox decides how the morning starts, and the hard work, the part that needs your whole mind, gets whatever is left. Usually what is left is a scatter of forty-minute gaps, and nothing difficult fits into forty minutes.
This is a template that plans the week from the inside out. It is a method, not a story about anyone’s life, and it is meant to be copied and then changed. The shape is simple: two protected blocks of deep work every working day, shallow work batched into fixed slots, and one short review at the end of the week.
Why blocks, not hours
“Deep work” is Cal Newport’s name for focused work on something cognitively demanding, without distraction.1 The useful part is not the name. It is the observation that this kind of work has a set-up cost. Before you can move a hard problem, you have to load it into your head: the code paths, the half-formed argument, the three constraints that contradict each other. Every interruption throws part of that away.
Researchers have looked at what switching costs. Sophie Leroy described attention residue: after you move from one task to another, part of your attention stays with the first one, and you do worse on the second, especially when the first was left unfinished (Leroy, 2009). A day cut into small pieces is a day spent mostly in residue.
So the unit of planning is the block, not the hour. A block is long enough to load a problem and still have time to move it.
The template
Here is the default week. The times are an example; the structure is the point.
- Block A, 90 to 120 minutes, first thing. The hardest task of the day, chosen the evening before, so that the block starts with work rather than with deciding.
- Shallow batch 1, 30 to 45 minutes. Messages, email, review requests, small admin.
- Block B, 90 minutes, after lunch or mid-afternoon. The second most demanding task, or the continuation of the first.
- Shallow batch 2, 30 to 45 minutes, end of day. Close loops, reply to people, write tomorrow’s Block A task in one line.
- Meetings go in the gaps between these, ideally packed into two or three days rather than spread across five.
- Friday review, 30 minutes. Described below.
That adds up to three or four hours of deep work a day: more than most calendars allow, and a ceiling rather than a floor. If you get one good block a day in the first few weeks, the template is already working.
Rules that keep the blocks standing
A block that anyone can cancel will be cancelled. A few rules help it hold:
- Blocks are on the calendar as busy. Not as “focus time, maybe”, but as an appointment with the same weight as a meeting.
- One task per block. Written down before the block starts. If you finish early, stop, or take the next item from the same project, never from the inbox.
- Notifications off, chat closed. Not muted: closed. If your team needs a way to reach you in a real emergency, agree on one channel and one rule (“call if production is down”) and leave everything else for the batch.
- The start is fixed; the end can move. Starting on time matters more than the length. A block that starts forty minutes late usually turns into a shallow one.
- Write interruptions down instead of acting on them. Keep a scratch list next to you. A thought about an email goes on the list, and the list goes into the next batch.
Batching shallow work
Shallow work is not bad work. Replying to a colleague or reviewing a small change matters, and leaving people waiting for days has its own cost. Batching means doing them in a few predictable windows instead of in every gap.
Two batches a day is a good default. Tell the people you work with when they are, so that a two-hour delay reads as a schedule rather than as silence. If your role is mostly coordination, you may need three or four batches and one block instead of two. The template bends. The principle stays: do not mix the two kinds of work in the same hour.
The Friday review
The review is what turns a set of habits into a system. Thirty minutes, the same questions every week:
- What did each deep block produce? One line per day.
- Which blocks were lost, and to what? Count them. After two or three weeks, patterns show up: the same recurring meeting, the same chaotic Tuesday.
- What are the three most important deep tasks for next week? Put each into a specific block now.
- What shallow work is piling up? Schedule it, hand it off or drop it.
- One change to the template for next week.
Keep the answers in one running document. After a month it is the most honest record you have of where your time goes.
The review is not there to grade the week. It is there to make next week’s first block easy to start.
When the week breaks
Some weeks break: a release, someone ill at home, a deadline that somebody else moved onto you. Protect one block a day and let the rest go without guilt. One block a day keeps a hard project warm, so you can pick it up again without reloading everything from zero. The worst outcome is not a weak week. It is a weak week that quietly becomes the new normal because nobody looked at it on Friday.
Making it yours
A few common adjustments:
- If your mornings belong to someone else (a team in another time zone, the school run), move Block A to the earliest hour you control and treat it the same way.
- If you are learning rather than shipping, give Block A to new material and exercises and Block B to practice and review. The rules do not change.
- If 90 minutes is too long right now, start with fifty and add ten minutes a week. A short block you keep beats a long one you skip.
The template does not promise that every block will be good. Some end with nothing to show except a clearer idea of why the problem is hard. That still counts, and the Friday review is where you will see it.2
If time zones shape your day, Working with Europe and the Americas from UTC+5 shows where to put the blocks around calls.